Satori Engineering Assistant

The Engineering Assistant for Grid Operators

Instant answers from your grid codes, protection relay files, and switching procedures - so your network engineers resolve issues faster and with confidence.

Every Grid Code Clause at Your Engineer's Fingertips

ENTSO-E Network Codes, relay manuals, switching procedures and asset documentation - cited, revision-aware and available in seconds.

Audit-Ready NC Compliance
Demonstrable, auditable compliance with ENTSO-E Network Codes and the Clean Energy Package - cited answers from SO GL, RfG, DCC and E&R on demand.
Protection Settings & Relay Manuals
Retrieve relay settings files, IEC 61850 SCL/SCD/CID, coordination studies and OEM relay manuals for any substation asset - in seconds, with page-level citations.
Safe Switching Operations
Step through switching sequences with direct references to approved switching programmes, PTW rules, SF6 handling procedures and arc-flash safety rules.
Grid Connection Throughput
Accelerated connection studies and protection re-settings as RES, storage and EV integration triple the workload for connection engineers.
Preserve Institutional Knowledge
As experienced protection and commissioning engineers retire, the assistant surfaces decades of embedded expertise - instantly, to the next generation of engineers.
CMMS, EAM & GIS Integration
Optional connectivity with CMMS/EAM, GIS and ITSM platforms - answers surfaced inside your existing workflows and work orders.

Up and Running in Days

No migration. No retraining. No new platform to learn. The assistant connects to where your documents already live.

01

Connect Your Documents

Securely connect SharePoint, Teams, or your document management system. Supports PDFs, drawings, specs, standards and any revision - inside your own Azure tenant, with no data leaving your environment.

02

Ask in Plain Language

Engineers ask questions exactly as they would ask a colleague - in their own language, on any device, inside Teams or SharePoint. No training required, no query syntax, no new workflow.

03

Get Cited Answers

Instant answers with page-level citations from your controlled documentation. Every response is traceable and auditable - grounded in the exact documents your team already relies on.

Understands Your Grid Documentation

Handles thousands of living documents - IEC/CENELEC standards, OEM relay manuals, ENTSO-E network codes, as-built SLDs and SAS architecture files.

Grid Codes & ENTSO-E Network Codes (SO GL, RfG, E&R, DCC)
Protection & Control Setting Files + Relay Manuals
Substation As-Built Documentation (SLDs, Schematics, SAS)
Operational Procedures & Switching Programmes
Primary Equipment OEM Manuals (Transformers, GIS, Switchgear)
International Standards (IEC, CENELEC EN, IEEE)
Asset Management Plans (CBM, DGA, PD, Thermography)
Commissioning & FAT/SAT Protocols
Custom integrations available. Ask us about integrations with your CMMS, EAM, GIS and ITSM systems.

Questions Your Engineers Are Already Asking

Real examples from TSO and DSO teams - protection engineers, control-room operators and connection engineers.

What is the minimum FRT voltage-time profile for a Type D power park module under NC RfG Article 16?
What SF6 pressure should the ready-for-service indicator show on the medium-voltage switchgear panel?
Walk me through the black-start procedure for an island within our synchronous area.
DGA on TR-2 shows rising acetylene - what IEC 60599 diagnostic ratios apply and what action level is triggered?
Protection IED GOOSE subscription timeout on bay 05 - what are the diagnostic steps?
Compare GB Grid Code ECC.6.3 vs VDE-AR-N 4120 reactive power requirements for a 50 MW solar farm.

Built for Every Role in Grid Operations

From protection engineers to control-room operators - the assistant adapts to how each team works.

Protection & Control Engineer
Retrieves relay settings, IEC 61850 SCL files, protection coordination studies and OEM relay manuals across the full substation estate - with page-level citations.
Substation Commissioning Engineer
Accesses FAT/SAT protocols, commissioning procedures, protection settings and as-built SLDs for any substation during energisation and handover.
Distribution Control-Room Operator
Queries approved switching programmes, PTW rules and emergency procedures in real time during planned outages and network events.
Grid Connection & Asset Management Engineer
Checks NC RfG/DCC/SO GL requirements, FRT profiles, reactive-power obligations and asset management plans for new connections and existing assets.