RES & BESS

The Engineering Assistant for Renewables & Battery Storage

Operational intelligence for wind, solar, and BESS - from grid connection compliance to O&M procedures and IEC standard lookups, instantly and with full source traceability.

Multi-OEM Portfolio Complexity, Solved

Every OEM manual, IEC standard, grid code and BESS safety document - cited, revision-aware and available to your technicians and SCADA engineers in the field.

Multi-OEM Portfolio Coverage
A typical 1 GW+ portfolio mixes turbines, inverters and battery systems from many different manufacturers - thousands of pages of manuals across OEMs and revisions.
Reduce Up-Tower Diagnostic Time
20–30 min saved per truck-roll at €120–180 each. Across a 50 MW wind site, a 0.2–0.5pp availability uplift is worth €30k–80k per year in additional generation.
BESS Safety Compliance
UL 9540A, NFPA 855, thermal-runaway HAZOPs and fire separation requirements - cited instantly for safety-critical BESS siting, commissioning and operational decisions.
Grid Code Audit Readiness
ENTSO-E RfG, VDE-AR-N 4110/4120, ENA G98/G99, REE P.O. 12.2 - TSO certification prep cut by ~50%. LVRT/HVRT and reactive-power evidence assembled in minutes.
Protect OEM Warranty Claims
Correct torque specs, lubricant grades and maintenance intervals cited from the right OEM manual and revision - every time - protecting FSA warranty claims on every asset.
High Turnover, Solved
Remote sites. Technician turnover at 15–25%/yr. New-joiner productivity from months to weeks via guided, cited answers in the technician's language - online or offline.

Up and Running in Days

No migration. No retraining. No new platform to learn. The assistant connects to where your documents already live.

01

Connect Your Documents

Securely connect SharePoint, Teams, or your document management system. Supports PDFs, drawings, specs, standards and any revision - inside your own Azure tenant, with no data leaving your environment.

02

Ask in Plain Language

Engineers ask questions exactly as they would ask a colleague - in their own language, on any device, inside Teams or SharePoint. No training required, no query syntax, no new workflow.

03

Get Cited Answers

Instant answers with page-level citations from your controlled documentation. Every response is traceable and auditable - grounded in the exact documents your team already relies on.

Understands Your Portfolio Documentation

Handles OEM manuals, service bulletins, IEC/UL standards, grid codes, commissioning packages and SCADA/CMMS records across multi-OEM wind, solar and BESS portfolios.

OEM O&M Manuals (Wind Turbines, Inverters, Trackers, BESS)
OEM Service Bulletins, Technical Notes & Field Service Instructions
International Standards (IEC 61400, IEC 62109, IEC 62933, UL 9540A)
Grid Codes & Network Codes (ENTSO-E RfG, VDE-AR-N, ENA G98/G99)
Commissioning & Handover Packages (SLDs, Protection Settings, FAT/SAT)
BESS Safety & Hazard Documents (NFPA 855, UL 9540A, HAZOP, Thermal-Runaway)
PPAs, ASAs & Grid Connection Agreements
SCADA/PPC Configuration & IEC 61850 SCD/CID Files
Custom integrations available. Ask us about integrations with your SCADA / PPC platform, CMMS / EAM, data historian, OEM monitoring APIs and document management system.

Questions Your Technicians Are Already Asking

Real examples from wind turbine technicians, BESS site engineers, SCADA engineers and plant performance teams.

"Torque specification and tightening sequence for the wind turbine nacelle main-bearing bolts?"
"What are the gearbox oil change intervals and approved lubricant grades for this turbine per the maintenance manual?"
"Central inverter error code 3503 - what is the documented troubleshooting tree?"
"Per UL 9540A and NFPA 855, what is the minimum separation distance between the battery enclosure units and the substation control building?"
"Reactive-power setpoint per Spanish P.O. 12.2 at a 33 kV POI under tan φ = 0.32 - how is it calculated?"
"How do I demonstrate LVRT/HVRT compliance under ENTSO-E RfG Article 21 for a Type C wind plant?"

Built for Every Role in Renewable Operations

From wind turbine technicians to SCADA engineers and plant performance managers - the assistant adapts to how each role works.

Wind Turbine Technician
Retrieves OEM torque specs, lubricant grades, fault-code troubleshooting trees and up-tower procedures - in their language, before the truck-roll.
Solar & BESS Site Engineer
Accesses inverter manuals, BESS safety procedures (UL 9540A, NFPA 855), commissioning protocols and grid-code setpoint requirements for any asset.
SCADA / Remote Operations Engineer
Queries IEC 61850 SCD/CID files, SCADA alarm libraries, PPC setpoint logic and OEM technical notes to diagnose communication and control faults remotely.
Plant Performance Engineer
Cross-references OEM performance guarantees, grid-code compliance evidence (LVRT/HVRT, reactive power), FSA warranty clauses and availability KPI definitions instantly.